Another little progress update,big thanks to Dec for coming down last Friday evening to lend a hand getting some wiring done.We did get pretty much all the engine bay wired apart from some lights and abs.
Wiring inside still needs to be finished but it's coming along well.On Friday night I finished the switch panel,so I just have to finish everything in the relay box and then wire the dash.
Under the bonnet we will be fitting a charge/jump point as the battery will be relocated inside behind the passenger foot rest.
New clocks arrived today so I couldn't resist getting out the hole saw and getting them fitted.We are fitting rev,water temp and oil temp there is also led,s for shift light oil pressure and battery charge.
When we were over at the Autosport show at the weekend i picked up two nice little Racetech wing mirrors.The plan is to make carbon fibre base plates and bolt the mirrors through.
So over the next few weeks there will have to be a big push towards finishing the wiring and also getting the gearbox back together.Only when this is done I can fire the engine for the first time since October.
Sent from my iPhone using Tapatalk